Improperly built decks can be dangerous. They are selected with a view to providing broad technical and geographical representation and are appointed by the National Research Council of Canada. This video will show you every step you need to take to build a deck in a day or two. Note that some local jurisdiction or state require higher, such as 42" in California. Learn about. Print; Share . ; The Building Act and regulations, including . Building permits are required: • When a deck or a platform is more than 30 inches above adjacent grade. The Quebec Code de Construction is not compulsory in the province. There are national codes (National Building Code) and provincial ones (Quebec Construction Code), but it’s best to check with your municipality to find out which version of the provincial code applies where you live and whether any specific bylaws also apply. Click on the "Show Postal Code" button to go get its postal code. We have a Residential Decks packet here that includes all of the information you need as well as the application materials for building a deck. The current BC Building Code does apply if an existing building. This will provide you with sufficient information to complete the project and meet the Ontario Building Code, allowing for a smoother permit application and inspection process. Pro Tips on Building a Code-Compliant Deck By Rob Robillard. Deck safety is a real problem. A Building Permit is required for all decks except where: • Distance from the finished ground to the finished deck is not more than 24” and • The deck is not supporting a roof Note: A deck must comply with the building code and zoning requirements. As a homeowner, you may choose to build the deck yourself, however Township staff would encourage you to obtain a proper set of construction plans provided by a design professional. Deck Construction Guide Based on the 2012 International Residential Code Code (IRC) Where applicable, provisions and details contained in this document are based on the International Residential [bracketed text references applicable sections of the IRC]. While you need to be aware of IRC requirements, it's often the local changes that do-it-yourself builders forget about. Does the BC Building Code apply to temporary buildings? A building permit and subsequent inspections will ensure your deck was built to code and there are no safety concerns in the construction of your deck. If your deck is below 30”, then you do not need a railing for most North American jurisdictions. Building Code compliance. Codes in force. Ontario's deck building codes are not the same as British Columbia's deck building codes. There is a lot to know about constructing a deck to comply with Minnesota’s building code, how to apply for and obtain a permit, and how inspections are handled. The BC Building and Plumbing Code, which set the technical requirements for building construction throughout B.C. The National Building Code of Canada sets basic parameters on decks, but provinces each have their own modifications based on climate. B1 Structure. To avoid serious risk, you will also want to ensure that you have the proper permits to complete whatever project you're embarking on. Being Inattentive to Local Deck Building Code . Many code requirements, while important, rarely touch upon life and death matters. Building code for deck railing indicates that you need a deck railing for any deck that is 30” or more above grade. For more information, contact The City of Oshawa’s Building Department at 905-436-5658. BUILDING CODE. Louis-H. Lafontaine, Bureau 204 Montréal (QC) H1K 4E4 ; 514 352-2427; 1 877 644-AIBQ (2427) FAX: 514 355-8248 13. If the building complies with Part 9 of BCBC, which regulates the construction of houses and small buildings, then the structural requirements must meet the prescriptive requirements specified for balconies and decks. In the public domain, contracts are drafted in French. The Ontario Building Code | Construction Requirements 3.11.3.1. New deck construction is regulated by the local jurisdictions and homeowners are advised to contact the local building code official for new deck code requirements and permitting. The process of framing a deck includes creating connections between joists, beams and support posts in order to build a code compliant deck structure. This in depth section will teach DIY builders to frame a deck, from installing a ledger board and frost footings to framing the perimeter of the deck. The same goes for each province and territory in the Great White North. Decks and balconies - playing it safe. International Residential Code (IRC) Reference Book for Deck Building. Note that the postal code may be searched with nearby approximation. I know in my neck of the woods every community requires you to pull a building permit when building a deck. Below is the select list of some major cities from Quebec, Canada. For example, if a building was constructed when the BC Building Code 2012 was in effect, it doesn't need to be upgraded to meet the requirements of the BC Building Code 2018. The information provided on this page was accurate when it was printed, but it could have changed since. Members of the Canadian Commission on Building and Fire Codes (CCBFC) are selected from across Canada for their individual interests and expertise rather than as delegates of any association or group. The rules governing contracts are set out in the Civil Code of Quebec. Note: The current British Columbia Building Code is applicable to all structures built in the province and the home owner is responsible to ensure the railing meets the requirements of the code. 4 Contracts Contract law in Quebec is essentially the same as that found in other North American jurisdictions. Don’t make these common mistakes when building a deck. British Columbia Building Code (BCBC)³ dictates the structural requirements for exterior decks and balconies including stairs and guardrails. 14. Other building regulations outside the BC Codes; Requirements for Building Officials who oversee and may enforce the Building Code through local bylaws Let us show you to build an attractive, strong and code compliant deck railing system at Decks… If there is no local code or code official, the 2018 IRC and AWC's DCA 6 document may be consulted. 1985, c. 34, s. 13; 1991, c. 74, s. 11; 2005, c. 10, s. 30. Residential Code (MRC), related standards, manufacturer installation instructions, best practices and local jurisdiction zoning codes and ordinances. It is issued by the National Research Council of Canada. • When a deck … These articles will explain the pros and cons of installing wood, composite, cable, metal and glass deck railings. A handful of states and some provinces, mandate railings begin at 24” above grade – not 30”. For more information, please consult the www.rbq.gouv.qc.ca or contact the RBQ at 1-800-361-0761. In force since November 7, 2000, the Code de construction du Québec consists of the National Construction Code – 2005, amended, and includes Part 10 for existing buildings. Building code requirements for exterior decking railings and stairways are especially stringent because decks fall into the category of critical health and safety matters. construction sites, a Building Code setting construction standards, a Safety Code, etc. Prescriptive construction methods recommended meet or exceed minimum requirements of the IRC. With so many building codes out there, it can certainly be overwhelming to find them all when you’re renovating or building a home from the ground up. While the 2015 IRC is complete and the decking industry was expertly represented by the North America Deck and Railing Association (NADRA), many jurisdictions still rely on the 2009 IRC as their standard.